1957 |
Joined
Godrej & Boyce Co. Vikhroli. |
1958 |
Joined K.E.C. Ltd.
Kurla Mumbai. |
1966 |
Promoted to Design
Engineer. Designed various types of Transmission
Line towers from 66KV to
220KV. |
1967 |
Promoted to Senior
Design Engineer. Responsible for handling various
Electricity Board projects independently. Looking
after the designs works. Projects submissions,
getting approval of designs, drawings. Also worked
in Research and festing department. Responsible
for carrying out many experimental designs. |
1972 |
Promoted to Deputy
Egg. Manager. Responsible for designing of 220KV
to 400KV S.C. horizontal Towers 400KV D.C. Towers.
Handled the Export Projects like. New Zealand,
Iran, Thailand indecently & at times visited
the foreign contries to get the design &
drawings approval. Also used to attend Tower Tests
frequently at our own Tower Testing Station at
Jaipur, Vashi, and Mumbai. |
1973 |
Head of
Quality Control Department . Additional
charge of Q.C.D. was entrusted in additions to the
Design work. Brought forward quite a number of
changes in fabrication shop to reduce the
rejection by Q.C.D. |
1974 |
Worked as a
Trouble shooter. Extended my
services to the Co. ‘s Erection Department to
solve their problems in Erection. Stringing and
foundations. I was also referred by M.S.E.B’s
Erection department to solve their problems of
erections stringing etc. |
1978 |
Promoted to
Engineering Manager Headed a term of about 10
Engineers. Responsible for planning Tender works.
Planning of Design and drawings Submission
replying queries from various Electricity Board.
Independently handled the projects of Electricity
Boards. E.g. Maharashtra state Electricity,
Rajasthan, Karnataka, Tamilnadu, Goa, Orissa, M.P.
and also handled export projects of Thailand and
Iran Visiting various Electricity Boards to bring
approval of designs. Drawings in time to release
the fabrication. |
1987 |
Left KEC International
after serving for about 30 years and getting an
experience of about 400 nos. of Tower Tests from
66KV to 400KV carried out at Kurla. Jaipur and
Vashi-Mumbai. On our own Tower Testing Stations of
the company. |
1988 |
Started to work on my
own Factory manufacturing LDPE/LD/PP bags at my
native place Bilimora, Gujarat. |
1992 |
Returned to Mumbai.
Got a private Consulting job of 400kv D.C. Tower
Designs for Saudi Arabia preparing Structural
Drawings. Lay out and Fabrication shops for 4
Types of towers and finished the job successfully
in about 6 months time. |
1993 |
Worked as a Consultant
to M/s. Kirloskar Consulting services Pune
Designed towers and structural drawings and got
tested successfully at Bangalore. |
1995 |
Joined Transpower
Engg. Jogeshwari as a Consultant Responsible for
training engineers on Tower Design. Looking after
the problems of M.S.E.B. and another Electricity
Boards |
2000 |
Left Transpower Engg.
As the Company closed down. |
2001 |
Started working for my
own Housing Society as a Treasurer and put it on a
sound Financial track. Regularize Accounts and
other papers of the Society. |
2006 |
Working as an Honorary
Consulting Engineer to look after the Society.
Rehabilitation work currently being carried
out. Worked as a consultant to Jyoti Power
Transmission and designed 2 type Towers.
Structural drawings Layout & Fabrication
shops. |